Use the 460 W high-load fan/PSU mark as the planning assumption for multitenant use, with GEN-I energy and URO network tariff estimates.\n\nValidation: npx --yes prettier@3 --check docs/HOST-MATRIX.md; python3 scripts/layered_soul.py validate . |
||
|---|---|---|
| .. | ||
| CAPABILITY-ROUTING.md | ||
| CLAWDIE-HERMES-FREEBSD-INTEGRATION.md | ||
| CONNECT-HERMES-SOUL.md | ||
| HIVE-ONBOARDING.md | ||
| HOST-MATRIX.md | ||
| MCP-INTEGRATION.md | ||
| MIGRATION-MANIFEST.md | ||
| TOOLCHAIN.md | ||