- Test count 259 → 258 (authoritative: full `cargo test --workspace` =
258 passed + 2 ignored live-agent tests).
- Phase 5 fleshed out into a concrete FreeBSD bridge-validation runbook:
prereqs (socat, pf on tailscale0), enable/start colibri_bridge, raw-TCP
round-trip via nc, and the Gap 7 cross-host coordination proof (remote
agent registers, intake task routes by capability, transitions to done).
Notes the shipped colibri_bridge.in hardcodes a real tailnet IP that
should be scrubbed separately.
Co-Authored-By: Claude Opus 4.8 <noreply@anthropic.com>